Vol 26 No 2 (2020)
Published: 2020-02-07
Articles
An improved time-cost trade-off model with optimal labor productivity
Abstract 2056 | PDF Downloads 1121 | DOI https://doi.org/10.3846/jcem.2020.11663
Page 113-130
Engineering harmony under multi-constraint objectives: the perspective of meta-analysis
Abstract 1742 | PDF Downloads 778 | DOI https://doi.org/10.3846/jcem.2020.11820
Page 131-146
Classification of construction hazards for a universal hazard identification methodology
Abstract 2963 | PDF Downloads 1722 | DOI https://doi.org/10.3846/jcem.2020.11932
Page 147-159
Time reduction effects of steel connected precast concrete components for heavily loaded long-span buildings
Abstract 1666 | PDF Downloads 611 | DOI https://doi.org/10.3846/jcem.2020.11673
Page 160-174
Assessing construction labours’ safety level: a fuzzy MCDM approach
Abstract 2896 | PDF Downloads 1641 | DOI https://doi.org/10.3846/jcem.2020.11926
Page 175-188
Compressive strength prediction of lightweight short columns at elevated temperature using gene expression programing and artificial neural network
Abstract 2069 | PDF Downloads 851 | DOI https://doi.org/10.3846/jcem.2020.11931
Page 189-199
Bayesian belief network-based project complexity measurement considering causal relationships
Abstract 2061 | PDF Downloads 1016 | DOI https://doi.org/10.3846/jcem.2020.11930
Page 200-215