Choi, Y., Park, C. Y., Lee, C., Yun, S., & Han, S. H. (2022). Conceptual cost estimation framework for modular projects: a case study on petrochemical plant construction. Journal of Civil Engineering and Management, 28(2), 150–165. https://doi.org/10.3846/jcem.2022.16234