[1]
Jaśkowski, P. and Sobotka, A. 2004. Scheduling construction projects with resources accessibility limited and changeable in time. Journal of Civil Engineering and Management. 10, 4 (Dec. 2004), 267-276. DOI:https://doi.org/10.3846/13923730.2004.9636319.