[1]
Bożejko, W., Hejducki, Z., Uchroński, M. and Wodecki, M. 2014. Solving resource-constrained construction scheduling problems with overlaps by metaheuristic. Journal of Civil Engineering and Management. 20, 5 (Jul. 2014), 649-659. DOI:https://doi.org/10.3846/13923730.2014.906496.