[1]
Cho, D., Cho, H. and Kim, D. 2014. Automatic data processing system for integrated cost and schedule control of excavation works in NATM tunnels. Journal of Civil Engineering and Management. 20, 1 (Mar. 2014), 132-141. DOI:https://doi.org/10.3846/13923730.2013.801907.