[1]
Koo, C., Hong, T. and Kim, S. 2015. An integrated multi-objective optimization model for solving the construction time-cost trade-off problem. Journal of Civil Engineering and Management. 21, 3 (Feb. 2015), 323-333. DOI:https://doi.org/10.3846/13923730.2013.802733.