[1]
Kim, B.-S. and Kim, Y.-W. 2015. Configuration of earthwork equipment considering environmental impacts, cost and schedule. Journal of Civil Engineering and Management. 22, 1 (Dec. 2015), 73-85. DOI:https://doi.org/10.3846/13923730.2014.897964.