[1]
Lee, C. 2022. Selecting high priority activities for the reallocation of resources to reduce construction duration. Journal of Civil Engineering and Management. 28, 7 (Sep. 2022), 590–600. DOI:https://doi.org/10.3846/jcem.2022.17204.