[1]
Plebankiewicz, E., Zima, K. and Wieczorek, D. 2021. Modelling of time, cost and risk of construction with using fuzzy logic. Journal of Civil Engineering and Management. 27, 6 (Jul. 2021), 412-426. DOI:https://doi.org/10.3846/jcem.2021.15255.