The paper presents the simulation model of concrete mix transportation process in the system – batching centre – a number of construction sites. An essential part of the analysed model is a multi-phase system of queues which emerge in concrete transportation characterised by: waiting time for loading, waiting for discharge, the distances from the plant to construction sites, the number and type of truck mixers used, the types of transport means for on-site deliveries, transportation costs. The paper also includes an example solved with a computer program designed on the basis of an algorithm formulated in the model.
Koźniewski, E., & Orłowski, Z. (2003). Concrete mix transportation modelling. Journal of Civil Engineering and Management, 9(1), 52-58. https://doi.org/10.3846/13923730.2003.10531301
This is an Open Access article distributed under the terms of the Creative Commons Attribution License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.