Tender documents often lack clarity and are incomplete, making it difficult for contractors to appropriately price projects. A general view is that the quality of tender documents has declined, which has affected the bidding strategies of contractors. However, the academic literature has focused mainly upon the views of contractors. To obtain a more balanced view of tendering practices, in-depth interviews were conducted with 10 practitioners (client, consultant, and contractor) who are involved in a common project at the same time in the UK construction industry. The contractor was satisfied that the quality of tender documents had been consistent. By contrast, both the client and the consultant agreed that the quality of tender documents is an ongoing issue. During the study it was revealed that tendering practice is influenced by the relationship between stakeholders or the unbalanced access to information rather than the accuracy and analysis of tender documentations. Tendering practices and proposed efficient ways of improving the bidding environment were examined. Using the awareness of other project stakeholder’s perspectives, this study can help the contractor to establish suitable tendering practices, and to mitigate tender risk at the bidding stage, which could effectively be implemented in the UK construction industry.

Keyword : risk management, tender document, tendering practice, bidding

How to Cite
Whang, S.-W., Donyavi, S., Flanagan, R., & Kim, S. (2022). Balanced approach for tendering practice at the pre-contract stage: the UK practitioner’s perspective. Journal of Civil Engineering and Management, 28(5), 338–348. https://doi.org/10.3846/jcem.2022.16580
Published in Issue
May 3, 2022
Abstract Views
1975
PDF Downloads
1027
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.

References

Adafin, J., Rotimi, J. O. B., & Wilkinson, S. (2016). Determining significant risks in the variability between design stage elemental cost plan and the final tender sum. Journal of Management in Engineering, 32(6), 05016016. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000448

Ahmed, M. O., El-adaway, I. H., Coatney, K. T., & Eid, M. S. (2016). Construction bidding and the winner’s curse: Game theory approach. Journal of Construction Engineering and Management, 142(2), 04015076. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001058

Alavipour, S. M., & Arditi, D. (2018). Impact of contractor’s optimized financing cost on project bid price. International Journal of Project Management, 36(5), 808–818. https://doi.org/10.1016/j.ijproman.2018.03.001

Alptekin, O., & Alptekin, N. (2017). Analysis of criteria influencing contractor selection using TOPSIS method. IOP Conference Series: Materials Science and Engineering, 245, 062003. https://doi.org/10.1088/1757-899X/245/6/062003

Al-Reshaid, K., & Kartam, N. (2005). Design–build pre-qualification and tendering approach for public projects. International Journal of Project Management, 23(4), 309–320. https://doi.org/10.1016/j.ijproman.2004.11.004

Arabiat, A., Edum-Fotwe, F. T., & McCaffer, R. (2007). Does client behaviour actively induce risk in construction projects? In Proceedings of the 23rd Annual ARCOM Conference (pp. 745–754), Association of Researchers in Construction Management, Belfast, NI.

Asenahabi, B. M., Busula, A. O., & Ronoh, R. (2019). A choice dilemma in the selection of an appropriate research design. International Journal of Advanced Research in Computer Engineering & Technology (IJARCET), 8(8), 348–356.

Asgari, S., Kandil, A., & Odeh, I. (2016). Optimal risk attitude for construction contractors in competitive bidding environments. In Construction Research Congress (pp. 2474–2480). https://doi.org/10.1061/9780784479827.246

Bagies, A., & Fortune, C. (2006). Bid/ no-bid decision modelling for construction projects. In Proceedings of the 22nd Annual ARCOM Conference (pp. 511–521), Birmingham, UK. Association of Researchers in Construction Management.

Benítez-Ávila, C., Hartmann, A., Dewulf, G., & Henseler, J. (2018). Interplay of relational and contractual governance in public-private partnerships: The mediating role of relational norms, trust and partners’ contribution. International Journal of Project Management, 36(3), 429–443. https://doi.org/10.1016/j.ijproman.2017.12.005

Bochenek, J. (2014). The contractor selection criteria in open and restricted procedures in public sector in selected EU countries. Procedia Engineering, 85, 69–74. https://doi.org/10.1016/j.proeng.2014.10.530

Bohari, A. A. M., Ikau, R. A., Budin, H., Hadi, N. A., & Chan, V. S. L. (2021). The key criteria in deciding to tender for construction projects. International Journal of Integrated Engineering, 13(3), 229–235. https://doi.org/10.30880/ijie.2021.13.03.028

Chairul, M., Umanailo, B., & Hamid, I. (2019). Utilization of qualitative methods in research universities. In Proceedings of the International Conference on Industrial Engineering and Operations Management (pp. 2076–2081). IEOM Society International.

Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., & Wong, J. M. W. (2011). An empirical survey of the motives and benefits of adopting guaranteed maximum price and target cost contracts in construction. International Journal of Project Management, 29(5), 577–590. https://doi.org/10.1016/j.ijproman.2010.04.002

Cheaitou, A., Larbi, R., & Al Housani, B. (2019). Decision making framework for tender evaluation and contractor selection in public organizations with risk considerations. Socio-Economic Planning Sciences, 68, 100620. https://doi.org/10.1016/j.seps.2018.02.007

Chisala, M. L. (2017). Quantitative bid or no-bid decision-support model for contractors. Journal of Construction Engineering and Management, 143, 4017088. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001407

De Schepper, S., Haezendonck, E., & Dooms, M. (2015). Understanding pre-contractual transaction costs for Public–Private Partnership infrastructure projects. International Journal of Project Management, 33(4), 932–946. https://doi.org/10.1016/j.ijproman.2014.10.015

Elhag, T. M. S., Boussabaine, A. H. & Ballal, T. M. A. (2005). Critical determinants of construction tendering costs: Quantity surveyors’ standpoint. International Journal of Project Management, 23(7), 538–545. https://doi.org/10.1016/j.ijproman.2005.04.002

Hassim, S., Muniandy, R., Alias, A. H., & Abdullah, P. (2018). Construction tender price estimation standardization (TPES) in Malaysia. Engineering, Construction and Architectural Management, 25(3), 443–457. https://doi.org/10.1108/ECAM-09-2016-0215

Heravi, A., Coffey, V., & Trigunarsyah, B. (2015). Evaluating the level of stakeholder involvement during the project planning processes of building projects. International Journal of Project Management, 33(5), 985–997. https://doi.org/10.1016/j.ijproman.2014.12.007

Hastie, J., Sutrisna, M., & Egbu, C. (2017). Modelling knowledge integration process in early contractor involvement procurement at tender stage – a Western Australian case study. Construction Innovation, 17(4), 429–456. https://doi.org/10.1108/CI-04-2016-0021

Hosny, H. E., Ibrahim, A. H., & Elmalt, A. E. (2019). Factors affecting quality of tender documents. Al-Azhar University Civil Engineering Research Magazine (CERM), 41(1), 346–355.

Jarkas, A. (2013). Primary factors influencing bid mark-up size decisions of general contractors in Kuwait. Journal of Financial Management of Property and Construction, 18(1), 53–75. https://doi.org/10.1108/13664381311305078

Jarkas, A., Mubarak, S. A., & Kadri, C. Y. (2014). Critical factors determining bid/no bid decisions of contractors in Qatar. Journal of Engineering Management, 30(4), 05014007. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000223

Khalifa, W. M. A., & Mahamid, I. (2019). Causes of change orders in construction projects. Engineering, Technology & Applied Science Research, 9(6), 4956–4961. https://doi.org/10.48084/etasr.3168

Krishna Rao, M. V., Kumar, V. S. S., & Kumar, P. R. (2018). Optimal contractor selection in construction industry: The fuzzy way. Journal of The Institution of Engineers, 99, 67–78. https://doi.org/10.1007/s40030-018-0271-1

Laryea, S. (2011). Quality of tender documents: case studies from the UK. Construction Management and Economics, 29(3), 275–286. https://doi.org/10.1080/01446193.2010.540019

Laryea, S., & Hughes, W. (2008). How contractors price risk in bids: theory and practice. Construction Management and Economics, 26(9), 911–924. https://doi.org/10.1080/01446190802317718

Laryea, S., & Hughes, W. (2011). Risk and price in the bidding process of contractors. Journal of Construction Engineering and Management, 137(4), 248–258. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000293

Laryea, S., & Lubbock, A. (2013). Tender pricing environment of subcontractors in the United Kingdom. Journal of Construction Engineering and Management, 140(1), 04013029. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000749

Liu, T., Wang, Y., & Wilkinson, S. (2016). Identifying critical factors affecting the effectiveness and efficiency of tendering processes in Public–Private Partnerships (PPPs): A comparative analysis of Australia and China. International Journal of Project Management, 34(4), 701–716. https://doi.org/10.1016/j.ijproman.2016.01.004

Lopez, R., & Love, P. E. D. (2012). Design errors in construction projects. Journal of Construction Engineering and Management, 138(5), 585–593. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000454

Love, P. E. D., Zhou, J., Matthews, J., Sing M. C. P., & Edwards, D. J. (2017). System information modelling in practice: Analysis of tender documentation quality in a mining mega-project. Automation in Construction, 84, 176–183. https://doi.org/10.1016/j.autcon.2017.08.034

Love, P. E. D., Ika, L. A., Ahiaga-Dagbui, D. D., Locatelli, G., & Sing, M. C. (2019). Make-or-break during production: shedding light on change-orders, rework and contractors margin in construction. Production Planning & Control, 30(4), 285–298. https://doi.org/10.1080/09537287.2018.1535675

Low, W. W., Abdul-Rahman, H., & Zakaria, N. (2015). The impact of organizational culture on international bidding decisions: Malaysia context. International Journal of Project Management, 33, 917–931. https://doi.org/10.1016/j.ijproman.2014.10.010

Mbachu, J., & Cross, C. (2015). Key drivers of discrepancies between initial and final costs of construction projects in New Zealand. PM World Journal, 4(9), 1–13.

Mohammed, H. H., Ibrahim, A. H., & El-Malt, A. E. (2019). Assessment of tender documents quality index. American Journal of Civil Engineering and Architecture, 7(4), 172–180.

Olawale, Y., & Sun, M. (2015). Construction project control in the UK: Current practice, existing problems and recommendations for future improvement. International Journal of Project Management, 33(3), 623–637. https://doi.org/10.1016/j.ijproman.2014.10.003

Oltmann, S. (2016). Qualitative interviews: A methodological discussion of the interviewer and respondent contexts. Forum Qualitative Sozialforschung / Forum: Qualitative Social Research, 17(2). https://doi.org/10.17169/fqs-17.2.2551

Oyeyipo, O. O., Odusami, K. T., Ojelabi, R. A., & Afolabi, J. A. (2016). Factors affecting contractors’ bidding decisions for construction projects in Nigeria. Journal of Construction in Developing Countries, 21(2), 21–35. https://doi.org/10.21315/jcdc2016.21.2.2

Puri, D. & Tiwari, S. (2014). Evaluating the criteria for contractors’ selection and bid evaluation. International Journal of Engineering Science Invention, 3(7), 44–48.

Queirós, A., Faria, D., & Almeida, F. (2017). Strengths and limitations of qualitative and quantitative research methods. European Journal of Education Studies, 3(9), 369–386.

Reza Alavipour, S. M., & Arditi, D. (2018). Impact of contractor’s optimized financing cost on project bid price. International Journal of Project Management, 36(5), 808–818. https://doi.org/10.1016/j.ijproman.2018.03.001

Saaidin, S., Endut, I. R., Samah, S. A. A., & Ridzuan, A. R. M. (2017). Stakeholder’s perspective on risks allocation in design and build projects in Malaysia. In MATEC Web of Conferences (Vol. 103). EDP Sciences. https://doi.org/10.1051/matecconf/201710303009

Schuhmann, R., & Eichhorn, B. (2017). Reconsidering contract risk and contractual risk management. International Journal of Law and Management, 59(4), 504–521. https://doi.org/10.1108/IJLMA-02-2016-0023

Simon, L., Jefferies, M., Davis, P., & Newaz, M. T. (2020). Developing a theoretical success factor framework for the tendering phase of social infrastructure PPPs. International Journal of Construction Management, 20, 613–627. https://doi.org/10.1080/15623599.2020.1720343

Tan, Y., Shen, L., & Langston, C. (2010) Contractors’ competition strategies in bidding: Hong Kong study. Journal of Construction Engineering and Management, 136(10), 1069–1077. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000219

Tarhini, A., Ammar, H., Tarhini, T., & Masa’deh, R. (2015). Analysis of the critical success factors for enterprise resource planning implementation from stakeholders’ perspective: A systematic review. International Business Research, 8(4), 25–40. https://doi.org/10.5539/ibr.v8n4p25

Urquhart, S., & Whyte, A. (2018). Contractor tendering research: going beyond bid/no-bid and markup models. Management, Procurement and Law, 170(6), 255–262. https://doi.org/10.1680/jmapl.17.00039

Urquhart, S., Whyte, A., & Lloyd, N. (2017). The development of a more efficient internal tender procedure of framework for Australian construction contractors. In Proceedings of the 33rd Annual ARCOM Conference (pp. 693–702). Cambridge.

Watt, D. J., Kayis, B., & Willey, K. (2010). The relative importance of tender evaluation and contractor selection criteria. International Journal of Civil Engineering, 28(1), 51–60. https://doi.org/10.1016/j.ijproman.2009.04.003

Wibowo, M. A., Astana, I. N. Y., & Rusdi, H. A. (2015). An analysis of bidding strategy, project performance and company performance relationship in construction. Procedia Engineering, 125, 95–102. https://doi.org/10.1016/j.proeng.2015.11.015

Xia, B., Chen, Q., Xu, Y., Li, M., & Jin, X. (2018). Design-build contractor selection for public sustainable buildings. Journal of Management in Engineering, 31(5), 040140701-7. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000295

Xiang, P., Hou, X., & Shen, L. (2015). Research on the phenomenon of asymmetric information in construction projects – the case China. International Journal of Project Management, 33(3), 589–598. https://doi.org/10.1016/j.ijproman.2014.10.007

Yuan, J., Skibniewski, M. J., Li, Q., & Zheng, L. (2010). Performance objectives selection model in public-private partnership projects based on the perspective of stakeholders. Journal of Management in Engineering, 26, 89–104. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000011

Yuni, N., Norken, I. N., Sudarsana, D. K., & Adnyana, I. (2017). Risk analysis of tender documents on the execution of private construction work at Badung Regency, Bali Province, Indonesia. Journal of Sustainable Development, 10(4), 130–142. https://doi.org/10.5539/jsd.v10n4p130

Zhang, S., Zhang, S., Gao, Y., & Ding, X., (2016). Contractual governance: effects of risk allocation on contractors’ cooperative behavior in construction projects. Journal of Construction Engineering and Management, 142(6), 04016005. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001111

Zhang, N., Deng, X., Zhao, X., & Chang, T. (2018). Exploring the sources of contractors’ competitive advantage on international HSR construction projects. International Journal of Civil Engineering, 17(7), 1115–1129. https://doi.org/10.1007/s40999-018-0373-1

Zhou, T., Xuedong, G., & Guiying, W. (2021). Construction method of tender document based on case-based reasoning. International Journal of Computers, Communications and Control, 16(3). https://doi.org/10.15837/ijccc.2021.3.4170