Measuring cash flow and overdraft for fuzzy project networks with overlapping activities

    Min-Chun Yu Affiliation
    ; Hui-Chung Yeh Affiliation
    ; Van-Loi Dang Affiliation

Abstract

Overlapping activities with imprecise durations to accelerate schedules has an impact on scheduling a con­struction project. The project may need to be rescheduled to suit the available overdraft limitation rather than to adopt the least total cost schedule. However, past research has seldom conducted a risk analysis on the project cash flow and overdraft requirements for projects with overlapping activities in a fuzzy environment. This research uses fuzzy DSM-based scheduling and proposes an algorithm to calculate the cash flow and overdraft at different risk levels. A numerical example is illustrated to demonstrate the algorithm’s effectiveness.

Keyword : project management, cash flow analysis, project overdraft, fuzzy sets

How to Cite
Yu, M.-C., Yeh, H.-C., & Dang, V.-L. (2017). Measuring cash flow and overdraft for fuzzy project networks with overlapping activities. Journal of Civil Engineering and Management, 23(4), 487-498. https://doi.org/10.3846/13923730.2016.1210215
Published in Issue
Apr 21, 2017
Abstract Views
677
PDF Downloads
1489
Creative Commons License

This work is licensed under a Creative Commons Attribution 4.0 International License.