Vol 27 No 3 (2021)

Published: 2021-02-26

Articles

Enhancement of bid decision-making in construction projects: a reliability analysis approach

Farzad Ghodoosi, Ashutosh Bagchi, M. Reza Hosseini, Tatjana Vilutienė, Mehran Zeynalian
Abstract 2127 | PDF Downloads 1281 | DOI https://doi.org/10.3846/jcem.2021.14344

Page 149-161

Experimental and numerical study on column-foundation connection through external socket

Haiying Ma, Minghui Lai, Xuefei Shi, Zhen Cao, Junyong Zhou
Abstract 1430 | PDF Downloads 908 | DOI https://doi.org/10.3846/jcem.2021.14100

Page 162-174

The cascade effect of collaborative innovation in infrastructure project networks

Ruixue Zhang, Xiaolong Xue, Yuanxin Zhang
Abstract 1694 | PDF Downloads 759 | DOI https://doi.org/10.3846/jcem.2021.14525

Page 175-187

Mechanical performance of recycled aggregate self-consolidating concrete column

Feng Yu, Chaochao Feng, Shilong Wang, Wei Huang, Yuan Fang, Shuangshuang Bu
Abstract 1103 | PDF Downloads 657 | DOI https://doi.org/10.3846/jcem.2021.14117

Page 188-202